As part of the project, HSE Invest has already designed conceptual solutions, provided laser scanning and 3D modelling of the plants, and prepared the conceptual design, the investment project identification document (DIIP) and the investment programme (IP).
The Client DEM plans to refurbish the secondary systems at the three HPPs by the end of 2025. Secondary systems include electrical protections, the control system, automated and sensory process devices, excitation systems, generator unit’s auxiliary systems, auxiliary power supply etc. In addition to the supply and installation of the equipment, the refurbishment also includes the execution of the necessary civil works and the preparation of the required documentation. The documentation is being designed in a BIM environment.
Spletno mesto www.hse-invest.si uporablja piškotke, ki v skladu z 225. členom ZEKom-2 (Zakon o elektronskih komunikacijah; Uradni list RS, št. 130/2022) ne zahtevajo pridobivanja vnaprejšnjega soglasja (privolitve) od uporabnika, in sicer:
- piškotki, ki so potrebni izključno zaradi prenosa sporočila po elektronskem komunikacijskem omrežju in
- piškotki, ki so nujno potrebni za zagotovitev storitve družbe, ki jo naročnik ali uporabnik izrecno zahtevata.
Vrste piškotkov
Piškotki, ki jih uporabljamo na tej strani, sledijo smernicam: