HSE Invest carried out consulting engineering services, project design and preparation of application software for the HPP and the HV switchyard.
In 2018, a large-scale project of refurbishing control systems and replacing secondary systems at Fala HPP, which celebrated its centenary year in 2018, was completed. The project included refurbishing of the turbine, generator, monitoring, excitation, and protection systems, refurbishing the systems for AC and DC auxiliary power, dismantling, assembly and refurbishment of the HPP control system and the 110 kV switchyard.
Spletno mesto www.hse-invest.si uporablja piškotke, ki v skladu z 225. členom ZEKom-2 (Zakon o elektronskih komunikacijah; Uradni list RS, št. 130/2022) ne zahtevajo pridobivanja vnaprejšnjega soglasja (privolitve) od uporabnika, in sicer:
- piškotki, ki so potrebni izključno zaradi prenosa sporočila po elektronskem komunikacijskem omrežju in
- piškotki, ki so nujno potrebni za zagotovitev storitve družbe, ki jo naročnik ali uporabnik izrecno zahtevata.
Vrste piškotkov
Piškotki, ki jih uporabljamo na tej strani, sledijo smernicam: