Upravljanje s piškotki
Piškotki so majhne datoteke, pomembne za delovanje spletnih strani, največkrat z namenom, da je uporabnikova izkušnja boljša.

Piškotek običajno vsebuje zaporedje črk in številk, ki se naloži na uporabnikov računalnik, ko ta obišče določeno spletno stran. Ob vsakem ponovnem obisku bo spletna stran pridobila podatek o naloženem piškotku in uporabnika prepoznala.

Za uporabo piškotkov se odločate sami. Piškotke lahko vedno odstranite in s tem odstranite vašo prepoznavnost na spletu. Prav tako večino brskalnikov nastavite tako, da piškotkov ne sprejemajo.
 
Sejni piškotki
Vedno aktivni
Funkcionalni piškotki
Soglašam
Ne soglašam
Analitični piškotki
Soglašam
Ne soglašam
cookieicon
cookieiconPiškotki
Spletna stran HSE Invest d.o.o. uporablja piškotke. Nujne, ki so potrebni za nemoteno delovanje spletne strani, smo že naložili. Sami lahko izberete, katere vrste piškotkov poleg nujnih bodo nameščene na vaši napravi.

PROJECTS

The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

FALA HPP - Refurbishment of secondary systems
Naročnik DEM d.o.o.
Leto izvedbe 2011-2018
FALA HPP - Refurbishment of secondary systems
HSE Invest carried out consulting engineering services, project design and preparation of application software for the HPP and the HV switchyard.

In 2018, a large-scale project of refurbishing control systems and replacing secondary systems at Fala HPP, which celebrated its centenary year in 2018, was completed. The project included refurbishing of the turbine, generator, monitoring, excitation, and protection systems, refurbishing the systems for AC and DC auxiliary power, dismantling, assembly and refurbishment of the HPP control system and the 110 kV switchyard.
Nazaj na seznam
© Copyright HSE Invest 2016. Vse pravice pridržane.  
Grafična in računalniška izvedba BuyITC d.o.o.