600 MW Unit 6 at Šoštanj TPP, Slovenia – design documentation | HSE Invest d.o.o.

Cookie Control
Piškotki so majhne datoteke, pomembne za delovanje spletnih strani, največkrat z namenom, da je uporabnikova izkušnja boljša.

Piškotek običajno vsebuje zaporedje črk in številk, ki se naloži na uporabnikov računalnik, ko ta obišče določeno spletno stran. Ob vsakem ponovnem obisku bo spletna stran pridobila podatek o naloženem piškotku in uporabnika prepoznala.

Za uporabo piškotkov se odločate sami. Piškotke lahko vedno odstranite in s tem odstranite vašo prepoznavnost na spletu. Prav tako večino brskalnikov nastavite tako, da piškotkov ne sprejemajo.
 
Necessary cookies
Always active
Functional cookies
Agree
Don't agree
Analytical cookies
Agree
Don't agree
cookieicon
cookieiconCookies
The HSE Invest d.o.o. website uses cookies. We have already loaded the necessary ones, which are required for the website to function smoothly. You can choose which types of cookies will be installed on your device in addition to the necessary ones.

PROJECTS

The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

600 MW Unit 6 at Šoštanj TPP, Slovenia – design documentation
Client HSE d.o.o.
Realization year 2014
600 MW Unit 6 at Šoštanj TPP, Slovenia – design documentation

For the 600 MW Unit 6 Project at Thermal Power Plant Šoštanj, HSE Invest prepared design documentation for civil structures - complete permitting design,  detailed design , as-built drawings, operation and maintenance instructions; and carried out nostrification of the detailed design, as-built drawings and operation and maintenance instructions for the technological equipment provided by the equipment supplier.  All the documentation was prepared in a joint 3D model.
 