The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

Refurbishment of 130 MW Zlatoločje HPP, Slovenia
Client DEM d.o.o.
Realization year 2005 - 2013
Refurbishment of 130 MW Zlatoločje HPP, Slovenia
The Zlatoličje HPP was constructed in 1969 and is the largest hydroelectric power plant in Slovenia. Its comprehensive refurbishment was of key importance for ensuring further reliable and safe supply of electric energy in Slovenia.  In addition to refurbishment of the complete electrical and mechanical equipment of the power plant, the project also included raising of the protection wall along the 17 km supply channel, works on the Melje dam and construction of the Melje SHPP.

HSE Invest carried out consulting engineering services.


MORE ABOUT PROJECT
Back to list
© Copyright HSE Invest 2016. All rights reserved.  
Graphic and technical implementation BuyITC d.o.o.