HomeProjectsReconstruction of HV switchyard at HPP Dravograd, Slovenia
PROJECTS
The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.
Reconstruction of HV switchyard at HPP Dravograd, Slovenia
Client
Realization year2011
HSE Invest prepared all design documentation for the reconstruction of the 110 kV switchyard.