PPE TOL, the combined-cycle unit of the Ljubljana Heating Plant | HSE Invest d.o.o.

Cookie Control
Piškotki so majhne datoteke, pomembne za delovanje spletnih strani, največkrat z namenom, da je uporabnikova izkušnja boljša.

Piškotek običajno vsebuje zaporedje črk in številk, ki se naloži na uporabnikov računalnik, ko ta obišče določeno spletno stran. Ob vsakem ponovnem obisku bo spletna stran pridobila podatek o naloženem piškotku in uporabnika prepoznala.

Za uporabo piškotkov se odločate sami. Piškotke lahko vedno odstranite in s tem odstranite vašo prepoznavnost na spletu. Prav tako večino brskalnikov nastavite tako, da piškotkov ne sprejemajo.
 
Necessary cookies
Always active
Functional cookies
Agree
Don't agree
Analytical cookies
Agree
Don't agree
cookieicon
cookieiconCookies
The HSE Invest d.o.o. website uses cookies. We have already loaded the necessary ones, which are required for the website to function smoothly. You can choose which types of cookies will be installed on your device in addition to the necessary ones.

PROJECTS

The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

PPE TOL, the combined-cycle unit of the Ljubljana Heating Plant
Client ENERGETIKA LJUBLJANA d. o. o.
Realization year in progress
PPE TOL, the combined-cycle unit of the Ljubljana Heating Plant
HSE Invest is carrying out supervision of works according to the Building Act and acts as the occupational health and safety coordinator.

PPE TOL, the combined-cycle unit of the Ljubljana Heating Plant (construction of gas units and refurbishment of fuel supply)
As part of the construction of the combined-cycle power plant, the Client Javno podjetje energetika Ljubljana d.o.o., plans to construct two gas turbines with a capacity of up to PEL=2x54 MWe and and input thermal power of up to 275 MWt (input power of both gas turbines), and two steam boilers utilising waste heat from hot exhaust gases of the gas turbine (heat recovery steam generator.

Natural gas will be used as the main fuel and extra light fuel oil (ELKO) as back-up fuel.
The construction area is divided into three zones:
1. The area of the new production plant PPE-TOL in the western section of the TE-TOL plant
- “A area”;
2. The area of the natural gas and extra light fuel oil supply pipeline;
3. The area of the ELKO transfer station and storage area along Zaloška cesta - 
“B area”;

Construction began in 2019 and will be completed approximately in the middle of 2022.
Back to list
© Copyright HSE Invest 2016. All rights reserved.  
Graphic and technical implementation BuyITC d.o.o.