The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

Upgrading of the demineralisation and decarbonisation control system 1 at the Thermal Power Plant Šoštanj (TEŠ)
Client TEŠ d.o.o.
Realization year 2020
Upgrading of the demineralisation and decarbonisation control system 1 at the Thermal Power Plant Šoštanj (TEŠ)
At TEŠ, HSE Invest upgraded the control systems for DEMI - water demineralisation and DEKA1 - water decarbonisation systems from PCS7 version 6.0 to PCS7 version 9.0. During the upgrade the software was also modified to ensure a more autonomous automatic operation of both systems whose operation is a precondition for the smooth operation of all three power plant units.

The DEMI and DEKA 1 systems are used for the demineralisation and decarbonisation of cooling water required for the operation of the units at the Thermal Power Plant Šoštanj (TEŠ). The reliability of the systems for preparing the cooling water directly affects power plant’s operation since the cooling water supply is only sufficient for a few hours of operation.





 