HSE Invest designed the Plave 2 HPP control system software based on the PCS7 V9.0 system. The control system includes unit control, communication with the control centre, remote control, switchyard control, auxiliary power supply control, automatic auxiliary power supply switching, and gate control.
Plave 2 HPP has been in operation since 2002 with an installed capacity of 20 MW. In 2020, the existing SAT control system was replaced with the new control system based on PCS7 V9.0.