Upgrading the Vuhred HPP and Ožbalt HPP control system | HSE Invest d.o.o.

Cookie Control
Piškotki so majhne datoteke, pomembne za delovanje spletnih strani, največkrat z namenom, da je uporabnikova izkušnja boljša.

Piškotek običajno vsebuje zaporedje črk in številk, ki se naloži na uporabnikov računalnik, ko ta obišče določeno spletno stran. Ob vsakem ponovnem obisku bo spletna stran pridobila podatek o naloženem piškotku in uporabnika prepoznala.

Za uporabo piškotkov se odločate sami. Piškotke lahko vedno odstranite in s tem odstranite vašo prepoznavnost na spletu. Prav tako večino brskalnikov nastavite tako, da piškotkov ne sprejemajo.
 
Necessary cookies
Always active
Functional cookies
Agree
Don't agree
Analytical cookies
Agree
Don't agree
cookieicon
cookieiconCookies
The HSE Invest d.o.o. website uses cookies. We have already loaded the necessary ones, which are required for the website to function smoothly. You can choose which types of cookies will be installed on your device in addition to the necessary ones.

PROJECTS

The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

Upgrading the Vuhred HPP and Ožbalt HPP control system
Client DEM d.o.o.
Realization year 2018-2020
Upgrading the Vuhred HPP and Ožbalt HPP control system
HSE Invest upgraded the Vuhred HPP and Ožbalt HPP’s control systems as they were using the PCS7 version V5.1. The new control system version is PCS7 V9.0. Software of both control systems was designed using the APL libraries of the PCS7 software environment. When upgrading the control systems, new functionalities, such as SMS alerting, replacing the synoptic automatic auxiliary power supply switching with operator panels, and WEB access were included.

Vuhred HPP and Ožbalt HPP have been in operation since 1956 and 1960 respectively, and were designed as sister power plants, each with a 73 MW net capacity. Upgrading of their equipment took place between 2000 and 2005 and included a transition to the PCS7 control system.
Back to list
© Copyright HSE Invest 2016. All rights reserved.  
Graphic and technical implementation BuyITC d.o.o.