As part of the Kneža SHPP construction, HSE Invest prepared the complete required design and investment documentation.
Kneža SHPP is the Client SENG’s 23rd SHPP. Kneža SHPP utilises a 74 m gross head and has a 850 kW power unit installed. The estimated annual production is 3300 MWh. The construction of the SHPP was very demanding especially due to a 2300 m long penstock.