The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

Upgrading the Zlatoličje HPP and Melje dam control system
Client DEM d.o.o.
Realization year 2016-2018
Upgrading the Zlatoličje HPP and Melje dam control system
Zlatoličje HPP was built in 1968 and is the largest channel type hydroelectric power plant in Slovenia with a net capacity of 136 MW. Upgrading the primary and secondary equipment was done between 2007 and 2013.

HSE Invest upgraded the control system software from the PCS7 version 6.1 to PCS7 version 8.0. When upgrading the PCS7 version, the software was also remodelled using newer libraries, replacing the software for IEC-104 communication with the DEM control centre, upgrading the software for automatic auxiliary power supply switching, and adding additional operator stations for local and WEB control.










 