After the refurbishment of the Fala HPP control system, the control and protection system of the 110 kV switchyard was also refurbished.
HSE Invest designed the 110 kV switchyard control software using the MicroSCADA system as an interface between the control and protection system of the 110 kV switchyard, integrating the switchyard to the PCS7 power plant control centre, and providing communication with the ELES and DEM remote control centres.