HSE Invest prepared a complete 3D model and, in collaboration with its partners, provided laser scanning of the 110 kV switchyard and generator floor.
After the refurbishment of Zlatoličje HPP, the civil design documentation from 1969 was digitalised. The advantages of a 3D model compared to the usual digitalisation of existing 2D drawings was presented to the Client DEM.
A complete 3D model was prepared for Zlatoličje HPP. Existing 2D drawings were used for preparing the model; laser scanning and point cloud modelling were used successfully for the first time.