The Boštanj HPP is the second hydroelectric power plant in the chain of six power plants on the Lower Sava River, with a rated capacity of 32.5 MW. It is a run-of-river/storage type power plant with three bulb generating units with a rated flow of 500 m3/s, five spillways and average annual output of 109 GWh.
HSE Invest carried out consulting engineering services.
MORE ABOUT PROJECT