Construction of OCV3 remote control centre building at DEM, Slovenia | HSE Invest d.o.o.

PROJECTS

The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

Construction of OCV3 remote control centre building at DEM, Slovenia
Client DEM d.o.o.
Realization year 2012
Construction of OCV3 remote control centre building at DEM, Slovenia
The OCV3 remote control centre building is a modern energy-efficient building. Heating and cooling of the building is carried out by utilising waste heat from the nearby Mariborski otok HPP, the ventilation system is provided with waste heat recuperation units, a so-called smart installation with a central system for functional control of all systems is installed.  The energy consumption for the operation of the building is kept at minimum.

HSE Invest carried out consulting engineering services and prepared a respective investment program.
 
Back to list
© Copyright HSE Invest 2016. All rights reserved.  
Graphic and technical implementation BuyITC d.o.o.