For the purpose of development of the project for construction of hydroelectric power plants on the middle section of the Sava River, HSE Invest prepared conceptual design and investment documentation for the following plants:
- 2x22 MW Suhadol HPP
- 2x19 MW Trbovlje HPP
- 2x18 MW Renke HPP