HPPs on the Middle Sava River, Slovenia – conceptual design | HSE Invest d.o.o.

PROJECTS

The company has numerous project references. The total installed capacity of these projects is over 1,000 MW, their total value is in excess of 2 billion EUR. In the years since the company's establishment, we have successfully completed or are still involved in over 200 projects. The projects that HSE Invest has been participating in include hydroelectric plants with capacities ranging from 0.2 to 185 MW with spillway structures up to a discharge of 4000 m3/s, and thermal power plants up to 600 MW capacity.

HPPs on the Middle Sava River, Slovenia – conceptual design
Client HSE d.o.o.
Realization year 2011
HPPs on the Middle Sava River, Slovenia – conceptual design
For the purpose of development of the project for construction of hydroelectric power plants on the middle section of the Sava River, HSE Invest prepared conceptual design and investment documentation for the following plants:
  • 2x22 MW Suhadol HPP
  • 2x19 MW Trbovlje HPP
  • 2x18 MW Renke HPP
Back to list
© Copyright HSE Invest 2016. All rights reserved.  
Graphic and technical implementation BuyITC d.o.o.